Integrated urban-rural water supply
Processing scale: 1000-10000 tons/day
Water supply population: 10000-50000 people
Container cloud control terminal: intelligent operation and maintenance of ultrafiltration membrane pool group, intelligent energy-saving, intelligent pressurization, etc.
Control container cloud platform: seamless connection between water source monitoring and water plant data, and customer water consumption and intelligent production. To provide big data support for on-demand production, energy conservation and consumption reduction.
·The water quality of the produced water can meet the direct drinking standard: it meets the requirements of the national "Hygienic Standards for Drinking Water" (GB5749-2006), with a turbidity less than 0.1 NTU, and it is far superior to the national standard in dealing with microbial and viral exceeding standards.
·Intelligence: Automatically adjust the blending ratio, and the equipment has a high water production rate.
·Do not add chemical agents to water production: solve problems such as strong smell of chlorine disinfection and opposition from villagers.
·Green purification process: using ultrafiltration membrane technology (Physical interception of ultrafiltration membrane and reduction of drug use)
·Unmanned: By utilizing the smart water plant control platform, remote monitoring and maintenance can be achieved to achieve unmanned or few people on duty throughout the entire plant.
·Strong resistance to impact loads: It has a high ability to cope with significant changes in water quality and quantity in areas.
·Equipment Health Online: Real time monitoring of equipment operating parameters and working conditions to ensure long-term stable operation of the equipment.
·Lean management: The entire factory achieves personnel online, cost online, asset online, and intelligent reporting.
·Decision support: Raw water scheduling model, intelligent energy-saving model, technology based production planning, and more reasonable operation of water plants.
·Five year warranty: Solve equipment quality issues that users are concerned about.
·Five years of operation and maintenance: solving user maintenance issues in the later stage.